Thanks Carrie for the article.
We have a very peculiar problem. We are using TD14.10. We have system level throttle for TPT Multiload and is 15. We are trying to run 7 MLOAD through TPT concurrently and is triggering 230 sessions.
Out of that 222 sessions, are moving to IDLE state and other 8 sessions are in delayed Queue. These 222 sessions are remaining in Queue for more than 20 mins and is not getting activated. It is remaining in the same state and it is not failing too. There is nothing active during this time.
if we are running 6 MLOAD jobs concurrently then everything is running smoothly without any issue.
Please let me know, what is the issue here.
Thanks in advance.
Thanks Carrie for the article.
We have a very peculiar problem. We are using TD14.10. We have system level throttle for TPT Multiload and is 15. We are trying to run 7 MLOAD through TPT concurrently and is triggering 230 sessions.
Out of that 222 sessions, are moving to IDLE state and other 8 sessions are in delayed Queue. These 222 sessions are remaining in Queue for more than 20 mins and is not getting activated. It is remaining in the same state and it is not failing too. There is nothing active during this time.
if we are running 6 MLOAD jobs concurrently then everything is running smoothly without any issue.
Please let me know, what is the issue here.